Home / Kitchens

A kitchen planned around how you cook.

From compact galley refreshes to open-plan kitchens with walnut islands — designed, permitted and built by one team.

Book a design visitEstimate a kitchen
Open kitchen with charcoal island, pendant lights and pale wood floor

Good kitchens start with the walk between sink, stove and fridge.

Before we talk finishes, we watch how you use the room: where groceries land, who cooks, where the kids do homework. Then we draw it.

Our kitchens are built with semi-custom or fully custom cabinetry from regional shops, stone templated by our own fabricator, and lighting planned in three layers.

Three directions clients choose

Every project is designed from scratch, but most start from one of these.

White shaker kitchen with walnut island and marble counters

Warm transitional

Painted shaker doors, walnut accents, honed marble.

Typically $62k – $95k
Kitchen with fluted black cabinetry, oak tall units and green bar stool

Dark modern

Fluted black fronts, rift oak, integrated lighting.

Typically $85k – $140k
Charcoal shaker kitchen with open shelves

Classic charcoal

Deep grey shaker, open shelving, subway tile.

Typically $48k – $78k

Included in every kitchen project

No surprise line items. These are in the proposal from day one.

Design

  • Measured drawings
  • 3D renderings
  • Showroom selections
  • Lighting plan

Construction

  • Demolition & disposal
  • Framing & drywall
  • Electrical & plumbing
  • Permits & inspections

Finishes

  • Cabinet installation
  • Stone template & install
  • Backsplash tile
  • Paint & trim

Care

  • Dust barriers & air scrubbers
  • Temporary kitchen
  • Weekly updates
  • 10-year warranty

Materials we love working with

See and touch all of them at our Quarry Road showroom.

Black walnutIsland panels, open shelves
Honed marbleCounters and backsplash
SoapstoneMatte, develops patina
Rift white oakTall units, flooring
Brushed nickelHardware, faucets
Finished white and walnut kitchen
Kitchen during demolition with exposed brick and framing
DuringAfter

Kitchens questions

How long does a kitchen remodel take?

Most kitchens take 9–12 weeks on site after a 3–5 week design phase. Cabinet lead times are the biggest variable, so we order them before demolition.

Can you keep our existing layout?

Absolutely, and it usually saves 15–25% because plumbing and gas stay put. We will tell you honestly if a small move would make a big difference.

Do you supply appliances?

We can, through our trade accounts, or install ones you buy. Either way we coordinate specs before cabinets are ordered.

Start with a conversation at your kitchen table.

A designer and a project manager visit together, measure, listen, and leave you with a realistic budget range — no obligation.