Home / Kitchens
A kitchen planned around how you cook.
From compact galley refreshes to open-plan kitchens with walnut islands — designed, permitted and built by one team.
Good kitchens start with the walk between sink, stove and fridge.
Before we talk finishes, we watch how you use the room: where groceries land, who cooks, where the kids do homework. Then we draw it.
Our kitchens are built with semi-custom or fully custom cabinetry from regional shops, stone templated by our own fabricator, and lighting planned in three layers.
Three directions clients choose
Every project is designed from scratch, but most start from one of these.
Warm transitional
Painted shaker doors, walnut accents, honed marble.
Typically $62k – $95kDark modern
Fluted black fronts, rift oak, integrated lighting.
Typically $85k – $140kClassic charcoal
Deep grey shaker, open shelving, subway tile.
Typically $48k – $78kIncluded in every kitchen project
No surprise line items. These are in the proposal from day one.
Design
- Measured drawings
- 3D renderings
- Showroom selections
- Lighting plan
Construction
- Demolition & disposal
- Framing & drywall
- Electrical & plumbing
- Permits & inspections
Finishes
- Cabinet installation
- Stone template & install
- Backsplash tile
- Paint & trim
Care
- Dust barriers & air scrubbers
- Temporary kitchen
- Weekly updates
- 10-year warranty
Materials we love working with
See and touch all of them at our Quarry Road showroom.
Kitchens questions
How long does a kitchen remodel take?
Most kitchens take 9–12 weeks on site after a 3–5 week design phase. Cabinet lead times are the biggest variable, so we order them before demolition.
Can you keep our existing layout?
Absolutely, and it usually saves 15–25% because plumbing and gas stay put. We will tell you honestly if a small move would make a big difference.
Do you supply appliances?
We can, through our trade accounts, or install ones you buy. Either way we coordinate specs before cabinets are ordered.