Home / Bathrooms

Bathrooms that feel calm at 6am.

Powder rooms to primary suites with curbless showers, heated floors and vanities built around the way you get ready.

Book a design visitEstimate a bathroom
Grey stone bathroom with round lit mirrors, black basins and a freestanding tub

Waterproofing first. Beauty second. Both matter.

Behind every Hearthstone shower is a fully bonded waterproof membrane, flood-tested for 24 hours before a single tile goes on. It is the part you never see and the part we care about most.

Above that, we design storage you will actually use, lighting that flatters, and tile layouts drawn out joint by joint.

Three directions clients choose

Every project is designed from scratch, but most start from one of these.

Bright white bathroom with freestanding tub and vessel sink

Light spa

Large-format porcelain, freestanding tub, warm whites.

Typically $38k – $62k
Dark bathroom with glass shower and blush stone basin on oak vanity

Moody stone

Dark slab walls, oak vanity, sculpted basin.

Typically $55k – $90k
Bathroom with glass shower, navy vanity and walnut mirror frame

Modern classic

Glass enclosure, painted vanity, wood-look tile.

Typically $28k – $46k

Included in every bathroom project

No surprise line items. These are in the proposal from day one.

Design

  • Measured plans
  • Tile layout drawings
  • Fixture selections
  • Lighting & ventilation

Construction

  • Demolition & disposal
  • Plumbing rough-in
  • Electrical & fan
  • Permits & inspections

Waterproofing

  • Bonded membrane
  • 24-hour flood test
  • Sloped shower pans
  • Sealed niches

Care

  • Dust barriers
  • Daily clean-up
  • Weekly updates
  • 10-year warranty

Materials we love working with

See and touch all of them at our Quarry Road showroom.

Large-format porcelainFewer grout lines, easy cleaning
Honed basaltShower walls and floors
White oakFloating vanities
Zellige tileHandmade glaze, soft sheen
Matte blackTaps and accessories
Remodeled bathroom with glass shower
Dated bathroom with pedestal sink and tub
BeforeAfter

Bathrooms questions

How long does a bathroom remodel take?

Powder rooms take 2–3 weeks, hall baths 4–6 weeks and primary suites 6–9 weeks on site, after design and selections are complete.

Can you convert our tub to a walk-in shower?

Yes, it is our most requested change. We will check joist direction and drain location first, and tell you if a curbless shower is practical in your home.

Will we lose our only bathroom?

If it is your only full bath, we schedule the noisiest, wettest work in tight blocks and can arrange a rental shower trailer for longer projects.

Start with a conversation at your kitchen table.

A designer and a project manager visit together, measure, listen, and leave you with a realistic budget range — no obligation.